Online Shop
My Basket
About HEYN Group
Contact us
ENGINEERING
FORKTRUCK
SHIPPING
WASTE
WASTE NEWS
Winter Products Special! - Cold spell coming!!
Heyn Waste are pleased to offer our Winter Products range in time for the upcoming Winter Freeze!
Online Store Expanded
Heyn Waste Solutions are pleased to announce that we have expanded our online store to include more products
Waste Home
Winter Products >
Winter Products Overview
Grit Bins
Grit Salt
Grit Spreaders >
Manual Grit Spreaders
Towable Grit Spreaders
Other Winter Products
Price List
Wheeled Bins
Wheeled Bin Spares
Underground Waste Systems
Recycling >
Internal Recycling
External Recycling
Hazardous Waste Recycling
Garden and Home Recycling
Document Destruction Containers
Litter Bins >
Free Standing >
Post / Wall Mounted >
Bollards
Street Furniture >
Bench Seating
Picnic Tables
Planters
Accessories
Traffiic
Storage >
Storage
Industrial Shelving
Office Shelving
Racking
Cantilever Racking
Lockers
Mezzanine Floors
Materials Handling
Environmental Products
Schools
Heyn Waste Catalogue
Heyn Handling Catalogue
Special Offers
Removable Bollard Fixing Details
Removable Bollards
Client to mark post locations.
Check service drawings provided by client if available.
Visual inspection for services, ie; inspection chambers.
Scan the location for live cables.
Existing surface to be broken out and 400mm cube to be excavated. Dry chippings to be placed in the base of the excavated hole. Place mild steel socket to fit flush with top of excavation.
Haunch base of Socket with a lean mix (1:2:4 concrete mix) and hold whist leveling off. The top on the socket should be level with the roadway. The lid should sit slightly proud of the roadway and should be free of any concrete. Test the top hinge to ensure correct operation. DO NOT allow the concrete to enter the inside of the socket.
Hold leveled position securely supporting the socket, Continue infill of cube, smooth off to road level.
Rinse off-residue concrete from top of the socket, using soft cloth and water, taking care not to scratch the surface of the socket. Finish off top surface of in situ concrete to give tight surface finish. Concrete should be protected by polyethylene during the first 24-hours following installation. This is particularly important during inclement and/or cold weather. Units should not be used until concrete has cured.
Installation Images and advice kindly provided by K Darlington Builders.
Downloadable Document
Heyn Waste Solutions Quick Links
Gritter
Gritter Liverpool
Gritter Edinburgh
Gritter Leeds
Gritter Newcastle
Gritter Glasgow
Gritter Scotland
Gritter Manchester
Snow Plough
Snow Plough Liverpool
Snow Plough Edinburgh
Snow Plough Leeds
Snow Plough Newcastle
Snow Plough Glasgow
Snow Plough Scotland
Snow Plough Manchester
Snow Shovel
Snow Shovel Liverpool
Snow Shovel Edinburgh
Snow Shovel Leeds
Snow Shovel Newcastle
Snow Shovel Glasgow
Snow Shovel Scotland
Snow Shovel Manchester
Rock Salt
Rock Salt Liverpool
Rock Salt Edinburgh
Rock Salt Leeds
Rock Salt Newcastle
Rock Salt Glasgow
Rock Salt Scotland
Rock Salt Manchester
Salt Spreader
Salt Spreader Liverpool
Salt Spreader Edinburgh
Salt Spreader Leeds
Salt Spreader Newcastle
Salt Spreader Glasgow
Salt Spreader Scotland
Salt Spreader Manchester